21st September 2026

Houlton Primary School – From construction site to school 🏗️✏️

It’s an exciting moment at Houlton Primary School, with the first spaces now open and being enjoyed by its very first Reception pupils. While work continues across the wider primary block, the school is already starting to feel like the place it was designed to be — full of colour, activity and young voices.

With the scaffolding coming down, the clay-tiled façade is finally getting its moment, complementing the existing brickwork of the secondary buildings. The primary buildings have a distinct architectural language for younger children, with pitched roofs that enable optimum CLT detailing and clay tiles providing a lower-carbon alternative to brickwork. The palette remains connected to the wider campus, helping the new and existing buildings read as one coherent school.

Inside, colour is beginning to bring the spaces to life. Painted metalwork on the stairs picks up reds and blues from the secondary buildings, while coloured lino and vinyl flooring add warmth and personality. The hall’s warm red takes its cue from the original terracotta tiles of the Power Hall, while a broader palette throughout the primary buildings brings an extra sense of joy to the spaces.

🌱 And beneath all of this, the building is working hard too.

The primary block is designed to achieve Passivhaus certification, with air testing now underway and final documentation being prepared.

The CLT structure provides a naturally efficient route to airtight construction, with every penetration carefully detailed and taped to maintain the integrity of the building envelope. Continuous thermal lines are also maintained around MEP elements, helping to avoid weak points in the building’s performance.

Air source heat pumps, MVHR and solar panels work together to provide efficient heating, ventilation and energy generation.

So while construction continues around them, Houlton’s first Reception pupils are already getting to experience the new spaces for themselves — a particularly satisfying milestone for everyone involved in bringing the primary school to life. 👏🏫