Luckley House Swimming Pool
About The Project
We were asked to design a replacement of the swimming pool at Luckley House on a site next to the current sports hall, as part of the overall masterplan. The existing pool requires replacing for a number of reasons, most importantly because its 21m length is not long enough to hold swimming competitions. The new building would include a 25m five lane enclosed pool, along with changing rooms and spectator seating with views over the playing fields. Its timber cladding echoes our designs for the completed music and library buildings.
Data
Client
Luckley House School
Value
£2.7m
Area
775m2
Date
2010
Location
Berkshire
